Murgatroyd Brine Pumps, Middlewich

Middlewich

Murgatroyd's update for December

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #3950

    Kerry Fletcher
    Participant

    All the boarding is off and so is all the asbestos sheeting apart from that under the tank which needs to be done separately. The windows and doors have all been uncovered, the boarding revealed another doorway which will be preserved, the frames are being kept as much as possible, new framework to receive the doors and windows will go in but for now those will be boarded back up until the final installation is needed. The main priority is keeping everything watertight, dealing with the purlins, redo the gable ends and wall plates where required. Work programme has been issued for the gantry work to start soon, replacing the timbers and steel work, all drawings have been issued. The water tank work has been priced up and agreed, so work on that will start in the new year. We are behind with the schedule and the project end date is moving to the first week of February.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.